Frequently asked
Common questions
- How long does an asphalt shingle roof last in Maine?
- A properly installed architectural asphalt roof in southern Maine typically lasts 25–30 years; premium (lifetime-rated) systems with ridge ventilation and full ice & water shield routinely reach 35+. Coastal exposure, attic ventilation, and underlayment choice all matter more than the shingle brand alone.
- Can you install over my existing shingles?
- We don't. Layovers hide rotted decking, void most manufacturer warranties, and trap heat that shortens the new roof's life. Every Pine & Gable asphalt job is a full tear-off down to the deck so we can inspect, repair, and start the system clean.
- What's the difference between 3-tab, architectural, and dimensional shingles?
- 3-tab shingles are the old flat single-layer style — we don't recommend them for Maine. Architectural (a.k.a. dimensional or laminated) shingles are two layers bonded together: thicker, heavier, wind-rated to 110–130 mph, and the modern default. Premium designer shingles add a third layer for a shake- or slate-like profile.
- Do I really need ice & water shield, and where?
- Yes — Maine code requires it, and it's the single most important detail in an asphalt roof here. We install ice & water shield along every eave (typically 3–6 feet up the roof, past the warm wall line), in every valley, around every penetration, and at sidewalls. It's what stops ice dams from leaking into your living room.
- What brands of asphalt shingles do you install?
- GAF Timberline HDZ and Ultra HDZ, Owens Corning Duration and TruDefinition, CertainTeed Landmark and Presidential, and Malarkey Vista and Legacy. We're installer-trained on all of them and we'll match the shingle to your home, your neighborhood, and your budget — not to whatever's on the truck.
- How long does the install take?
- Most standard residential asphalt roofs are torn off and re-installed in one day, with cleanup and magnet sweep the same evening. Larger, steeper, or cut-up roofs may run into a second day. Your quote spells out the expected schedule before we start.